Support & Guides

BOM Management Guide

Learn how to upload part lists, organize by test equipment, and request structured RFQs in minutes.

Managing high-volume test consumables doesn't have to be messy. Follow these 3 simple steps to digitize your Bill of Materials (BOM) and streamline your sourcing.

1

Prepare your Document

Before uploading, ensure your part list is saved in a compatible format (.CSV, .XLS, or .XLSX). For the AI engine to read it perfectly, your file should include at least two main columns:

Part Number (Required) Quantity (Required) Description (Optional)
100-254-12 500 Test Probe 100mil Crown
R-100-CR 500 Receptacle Crimp
2

Upload to the Platform

Navigate to the BOM Management section in your dashboard. You can either click the upload button to browse your files or simply drag and drop your spreadsheet into the designated area.

Drag & Drop your BOM here Supports .CSV, .XLS, .XLSX up to 10MB
3

Organize & Request RFQ

Once uploaded, the platform's AI will parse your items. You can now group these parts by specific Test Equipment (e.g., "ICT Line 1" or "FCT Audio Tester") to keep your maintenance records organized.

Finally, click the Request RFQ button. Our system will immediately structure your request, check for equivalents, and send it to our procurement team for a rapid formal quote.

ICT Fixture Project Alpha

12 Items • 2,400 Total Qty

Still having trouble?

If your BOM has a highly custom format or includes proprietary part numbers, our engineering team can map it manually for you.

Contact Support